TDL Industrial Automation

Power

Control system integration and subsidiary systems for power generation plants.

Power-plant work includes the subsidiary-systems control upgrade at Pha Lai Thermal Power Plant 2 (2020) — legacy PLC-5 and Citect migrated to ControlLogix and FactoryTalk View SE for ESP, FGD, ash handling and water treatment — and ESD system consultation for the Thai Binh 2 coal-fired plant (2022).

Typical applications: subsidiary-systems control (ESP, FGD, ash, water and wastewater treatment) · legacy PLC/SCADA migration · ESD system review.

Safety values to be verified by Engineer before signed issue. Any SIL, response time or safety-function statement on this page is descriptive only and does not constitute a certified claim.

Services for this industry

Projects